No products available yet
Stay tuned! More products will be shown here as they are added.
Position the nets
1. Hold the rolled net and once you find the starting end, begin to unroll it
2. Drive the stakes into the ground by pushing the metal tip into the soil with your hand as close as possible to the tip,
3. Tension the net properly,
4. With great care, secure the net and connect the clamp to the cable Rif. 59L and to the energizer unit,
5. Remember to install the ground stake Rif. T1.
Setting up the BADI FARM fencing system is easy and quick
A kilometre of ribbon installs in about 30 minutes—just start by positioning the corner pieces and tensioners at the peaks and angles, then continue of course with the insulators on the stakes or fibre posts with insulators already inserted
Step 1
Attach the ribbon to the buckle of the tensioner Rif. 44V. Thread the ribbon through.
Step 2
Secure it with the hook.
Step 3
Tension the ribbon.
Step 4
To lock it, thread it back through.
Step 5
Secure the excess ribbon with the convenient clip. Unroll the ribbon to the next tensioner, pull the ribbon without any issues and secure it to the second buckle.
Step 6
Now you need to thread it through the insulator: open the insulator.
Step 7
Insert the ribbon.
Step 8
Tighten.
Stay tuned! More products will be shown here as they are added.
check_circle
check_circle