Instructions

Positioning the BADI FARM fencing system is quick and easy

One kilometer of tape can be installed in about 30 minutes: just start by positioning the parts such as corner insulators and tensioners at the tops and corners, and obviously continue with the insulators on the posts or the fiberglass posts with the insulators already inserted.

Step 1
Step 1

Attach the tape to the buckle of the Ref. 44V tensioner. Pass the tape through it.

Step 2
Step 2

Secure it with the prong.

Step 3
Step 3

Tension the tape.

Step 4
Step 4

To lock it, pass it back through.

Step 5
Step 5

Secure the excess tape with the handy clips. Unroll the tape up to the next tensioner, pull the tape, and secure it in the second buckle.

Step 6
Step 6

Now you have to pass it through the insulator: open the insulator.

Step 7
Step 7

Insert the tape.

Step 8
Step 8

Screw it tight.

Instructions

Positioning the BADI FARM fencing system is quick and easy

One kilometer of tape can be installed in about 30 minutes: just start by positioning the parts such as corner insulators and tensioners at the tops and corners, and obviously continue with the insulators on the posts or the fiberglass posts with the insulators already inserted.

Step 1
Step 1

Attach the tape to the buckle of the Ref. 44V tensioner. Pass the tape through it.

Step 2
Step 2

Secure it with the prong.

Step 3
Step 3

Tension the tape.

Step 4
Step 4

To lock it, pass it back through.

Step 5
Step 5

Secure the excess tape with the handy clips. Unroll the tape up to the next tensioner, pull the tape, and secure it in the second buckle.

Step 6
Step 6

Now you have to pass it through the insulator: open the insulator.

Step 7
Step 7

Insert the tape.

Step 8
Step 8

Screw it tight.

No products available yet

Stay tuned! More products will be shown here as they are added.